Type:

Endofterrace

Service:

Construction

Completed:

April 2020
12/ 16

Before this project could be started almost 4 tonnes of rubbish and refuse was removed from the house and garden!! Our instructions were to refurbish the property in order that it could be successfully let. We love managing these refurbishment projects and so jumped at the opportunity! The works required involved a new heating system, kitchen and bathroom together with a full redecoration of the property. The project was scheduled to take 8 weeks.

After Completion

This two bedroom, timber framed terrace home in Ashford, Kent had been let for a number of years and was in a very tired condition. A new kitchen, bathroom and a full d├ęcor has brought it back to life and it is now home to some lovely new tenants.